Surrey Road water supply upgrade
- Project typeWater supply upgrade
- Contractor nameFulton Hogan
- Completion Date29 May 2026
The water main on Surrey Road provides the water supply to surrounding residents and other areas of Springvale.
The current 1km main (from Chester Road to Parsons Street) has reached the end of its useful life and it needs to be replaced and upgraded to ensure continuity of supply to the Springvale area. The main will be replaced with a new 180mm PE (plastic) pipe using a directional drilling method, which means less disruption above ground.
This project is part of a wider programme of works within the council’s Long-Term Plan and Water Asset Management Plan to upgrade the level of service available through the water network.
This work will strengthen the resilience and performance of the local water network. Upgrading this section of main will reduce the risk of future disruptions, improve service reliability, and ensure the infrastructure can meet current and future demand in the Springvale area.
Benefits
This project will benefit the Surrey Road area in the following ways.
Improved reliability of water supply
- Replacing ageing infrastructure reduces the likelihood of leaks, bursts, and unplanned outages
- Ensures a consistent and dependable water supply for residents and businesses in Springvale
Reduced maintenance and emergency repairs
- New 180mm PE water main is more durable and resistant to corrosion and ground movement
- Fewer emergency callouts and reactive repairs
Increased network capacity and performance
- Larger, modern pipe improves water flow and pressure
- Better supports future growth and development in the area
Improved public health and water quality
- New infrastructure reduces risk of contamination from pipe failures
- Supports safe, clean drinking water standards
Minimal surface disruption
- Directional drilling methodology reduces the need for open trenching
- Less impact on traffic, driveways, landscaping, and local amenities
A general view of work on Surrey Road
A new fire hydrant being installed
The water pipe being installed underground
The welding shed in Surrey Road
Lane closures
Lane closures will be in place during the main replacement. Traffic management and detours will guide people safely around the area.The work will be carried out in three stages. As each stage is completed, the closure points will move.
Residents, businesses, emergency services, and recycling/rubbish collections will still have access. Bus stops located inside the closure points on Surrey Road will be temporarily relocated to 3 Devon Road and 45 Devon Road.
Detours will change depending on the stage of work. The routes are:
- Parsons Street→ Carlton Ave extension → Fitzherbert Avenue → Lincoln Road → Oxford Road → Surrey Road
- Durham Road → Devon Road → Parsons Street → Lincoln Road → Oxford Road.
- Oxford Road → Lincoln Road → Chester Road → Hereford Street → Durham Road → Devon Road → Parsons Street → Surrey Road
Delays may be possible. Please follow the temporary signage and instructions provided by the traffic management team.
Location
Surrey Road, WhanganuiSpringvale 4501 View Map
-39.9275283,175.0205507
Surrey Road ,
WhanganuiSpringvale 4501
Surrey Road ,
WhanganuiSpringvale 4501
Surrey Road water supply upgrade
Images